Interface Pads Eliminated and Operating Efficiency Achieved
Paraffin and Asphaltenes inhibited
Asphaltene Problems Eliminated as Production increases over 150%
Gas Production increases 89 mcf/d
Continuous Application Keeps Paraffin in Solution
Production Revenue Increases $1250 per Day!
Proper Treatment of Frac Fluids Key to Well's Long-Term Health
Biogenic Sulfide Production Controlled with B-8650
Shut-in Well Returned to Production
Filter Changes Reduced from Every 4 Hours to Every 4 Days
Iron Sulfide Issues Resolved
One Time Treatment Proves to Be Cost Effective
H2S Levels Reduced Below 4 ppm to Meet Sales Specs
Bacteria and Scale Eliminated with use of NaturaLine™ Program
Change to Oil Soluble Corrosion Inhibitor Proves Successful
Economic Treatment Program Also Reduces Failures
Emulsion Problems Resolved by Removing an Ineffective Corrosion Inhibitor
Using MX 6-1033 as a pigging tool
Used to Replace Several Products
Iron Levels Reduced and FeS Solids Eliminated
Repairs and System Down Time Eliminated
Oil Production Increases 7 Barrels per Day
Producer nets 150 Barrels of clean oil and a clean system
Treating Costs reduced 40% and Regulatory Fines Reduced
Elimination of emulsion and solids deposition
Treating Frac Flow Back Emulsions
Achieves $22,500 in Savings
Sales Tank Treating Eliminated
Injectivity Issues Reduced and Oil Production Increased
Shut-In Well Returned to Production Preventing $10,000/Day Revenue Loss
Costly Remediation Steam Treatments Eliminated
Reduces amount of chemical required for water clarification
Congealed Oil and Emulsion Issues Resolved
Operation Downtime and Filter Cost Reduced
Water Quality Improves as Direct Savings of $156,000/year Achieved
Improved injection water quality
Reduces LOE and increases revenue $7110 / day
Production Increases 150 MCF/Day for a 1,029% ROI
Costly capital expenses are eliminated!
Producers LOE Lowered with MC FA-4210
Production increases 24.5mcf / day for 1,330% ROI.
Production increases 900 mcf/d for 7,750% ROI
Production Increased from 350 mcfd to 850 mcfd and Stabilized
Return on foamer investment: 4,960%
Frac Rate Increased and Load Return Accelerated
LOE decreases and production revenue increased $770 / day
Gas Production Increases 300 MCF/day on Shut-In Well
Lease Operating Expenses and Operator Intervention Reduced
Gas Production Stabilizes at 1 MMCF/day
Water and Condensate production triples!
MC MX 23-8 Scavenger Eliminates H2S
Production increases 325 MCF/d - 5,300% ROI!!
Production restored with MC FA-4249
Capital Costs and Shut-in time Eliminated
Incremental Increase of Surface Gas Production
Production Increased 400 mcf per Day!
Production Increases 450 mcfd and Scaling Tendencies Mitigated
$96,000/yr in Rental Expenses Eliminated; Gas Production Increased 80 mcfd
Gas Production Increases 350 MCFD on Shut In Well
Re-Entry Well Kickoff / Production Increased from 42 mcfd to 1,500 mcfd
Production Increased 200 mcfd or $275,000/yr!
Gas Production Increases 96 MCFD on Logged Off Well
Operator Saves $60,000/yr and Increases Production 400 mcf/day
Production Increased 400%, from 300 mcfd to 1,200 mcfd
Stabilized Well at Desired Flow Rate
Production of 200 mcfd Attained from Dead Well!
Foamer Additive Pays Big Dividends for Operator
Production Increases 100 mcfd!
Production Increases 820 mcfd and 10 BOPD
Foaming Application Eliminates Operator Intervention and Increase Production 37%
Operator No Longer Purchases Gas for Gas Lift Well
80/20 Condensate/Water Well Unloads Beyond Expectations
Production Increases Significantly During Trial
Production Increases 265% Along with New Oil Production
Production Increases 265% Along with New Oil Production
Production Increases 2733% and Pumping Units Eliminated
Operator Saves Money Over and Above Pump Company Product
MC MX 927-5 lowers pressure needed to drive hydraulic motor
Oil and Gas production more than Doubles in First 45 days
Reduce Shut In Time from Elevated Hydrogen Sulfide Levels
Eliminates Shut In of 45 mmcf/day Gas Production
Produced Gas Now Within Pipeline Spec
Multi-Chem Manager Designs Tower to Help Operator Cut Costs $240/day
Iron Sulfide Levels and Odor Eliminated
Effectively Reduces H2S and Provides $40,000 / Year Chemical Savings
System Efficiency Increases; 34% Increase in Sulfur Removal
Operator Able to Produce Gas Wells
Well Produces 480 MCF/day H2S-Free Gas
Chemical Plugging Issues Resolved
Continuous Treatment Provides Economic Solution
Scavenger Chemistry Utilized to Create Maximum Value
Operator Saves $120,000 / Year
Pipeline Specs Met As Operator Saves $36,000/Year
$115,000 Annual Savings Achieved
Treatment Program Reduces TCO by 50%
GOM Producer Able to Keep Well Running Continuously.
Superior Service Provided by Multi-Chem Outshines Competition
Dosage Rates Cut 73% with Superior Performing Product
Chemical Efficiency Improved Over Incumbent Supplier's Program
Chemical Efficiency Improved Over Incumbent Supplier's Program
Batch Tower Run Time Extended 28% and Flooded Tower Rates Cut 40%
MC HI-1000 Eliminates Hydrate Problems
Solids Removal and Prevention Increases Oil Production
Filter Changes Reduced from Unscheduled Weekly to Scheduled Monthly
Gas Production Increases 50 MCF/day and LOE Reduced
Operator Saves $390,000/Yr and Operation Efficiency Improves
Lease Operating Expenses Reduced as Production Increases
H2S Reduced and Production Increased
Oil Production Increases 3 Barrels / Day with Clean Water
Injection Well Problems Eliminated - Pressure and Flow Improved
Long Term Benefits from a Single Treatment
Black FeS Dissolved and Savings of $58,100 / year Projected
Squeeze Treatment Proves to be Effective for Over 6 Months
LDHI evaluated but Methanol still best option
"Super Methanol" Provides Savings of $2600 / Month
Savings Over Methanol and LOE slashed!
Pigging Time Cut Significantly Reducing LOE
Control Costs Reduced $7,440 / month (57.1% Reduction)
Controlling hydrate formation in a 9-mile subsea tieback
Methanol Issues Eliminated and Injection Rates Cut by 98%
Methanol Usage Eliiminated
Methanol Eliminated and Costs Slashed
MC MX 892-5 Outperforms Competitive LDHI
Cost-Effective solution provides $1572/month in savings over Methanol!
Cost Effective Hydrate Control & Savings in Trucking Costs Realized
MC P-3139 Triples Gas Production
Multi-Chem products paraffin control P-3901 and foamer FA-4001 successful
Pipeline Required Stringent Oil Quality from the Producer
Wire-Line Cutting Eliminated Saving Operator $10,000/month
Paraffinic Emulsion Block Eliminated - Saves Producer $600,000 / Incident
Producer Realizes Large $ Savings
Problems with Wax in Pipeline Eliminated
$150,000 in Revenue Added and LOE Slashed!
Provides a Quick Solution for Troublesome Issue
Power Oil System Functions More Efficiently
Also Removes Emulsion Problems tied to Paraffin
Hot Oiling Jobs No Longer Required
Effective reduction in wax treating costs
30% Pipeline Volume Removed Economically
Five Wells Successully Batched to Remove Paraffin Deposition
Wire-line Costs Reduced and Production Improved
Swab Truck and Workover Rig Costs Significantly Reduced
Liquid Levels Controlled and Profit Increased $19,000 per week!
S-2355 Reduces Downtime and Greater Water Disposal Costs
Multi-Chem Scale Inhibitor Inhibits BaSO4 Scale
System Downtime and Reparation Costs Eliminated
MC S-2041 Inhibits Scale and Nets Producer $2,400 in Increased Production
Injection Volumes Maintained with Cost-Effective Solution
Salt Controlled and Workovers No Longer Required
Single Treatment Lasts over 5 Months
LOE Reduced $240,000/year
Producer Saves $125,000 in Cleanup Costs and Lost Revenue
Operator's Net Revenue Increased $16,000/month
Failures Eliminated on Rod Pump Well
Failures Eliminated as Production Increased 300%
Increased Revenue for Gas Producer
TCO Reduced $38.7K / yr for a 27% ROI
Costs and Messy Cleanups are Eliminated
Well Returned to Profitable Production
Cost Savings of $32,880/Year/Well Achieved
NaturaLine™ MX 14-5 Saves Operator $118,000
Treatment Program a Fraction of Previous Program
$1.46 Million in Annual Savings Achieved
Downtime Reduced as Operating Costs Are Slashed
Production Increased 1400% (350 MCF/D and 11 BOPD)!
Hydraulic Pump Run Time increases along with Gas Production
Pressure Dropped 1000 PSI and Water Injection Increased 500 BWPD
Gas Production Up 456%. Oil Production Up 107%.
Typical Frac Job Time and Expenses Slashed
Deposition and Acid Jobs Eliminated with Continuous Injection Program