• HS&E
  • Request Information
  • Login
  • Careers
  • Product Index
  • Resources
  • About Us
Thursday, February 23, 2012  
multi-chem
facebook  twitter  youtube    
  • Completions
  • Production
  • Pipeline
  • Deepwater
Unconventional Oil & Gas Development
NaturaLine™ Solutions
To learn more about Multi-Chem, our chemical services and solutions, or other industry-related topics of interest, feel free to look through some of our case histories, press releases and public relations materials.

Or sign up for our E-Newsletter and stay up to date on industry activities and trends.
Case Histories
Press Releases
Brochures
Articles
Press Kit
Sign up for our E-Newsletter
First Name
Last Name
Email
 
Case Histories
MC P-3035 Eliminates Paraffin Problems
Interface Pads Eliminated and Operating Efficiency Achieved
Multi-Chem earns 19.5 Million for customer
Paraffin and Asphaltenes inhibited
Multi-Chem P-3100 Asphaltene Dispersant Increase Production
Asphaltene Problems Eliminated as Production increases over 150%
FA-4013 controls corrosion and unloads well
Gas Production increases 89 mcf/d
MC P-3139 Removes Paraffin Deposition
Continuous Application Keeps Paraffin in Solution
MC P-3014 Batch Treatment Revives Gas Over Bitumen Well
Production Revenue Increases $1250 per Day!
Asphaltene Inhibition
Sub-Sea Tieback
MC B-8650 in Frac Jobs Eliminates H2S Problem
Proper Treatment of Frac Fluids Key to Well's Long-Term Health
Multi-Chem Saves Producer $138K / Year On Acid Jobs
Biogenic Sulfide Production Controlled with B-8650
High H2S Levels Eliminated with MC B-8900
Shut-in Well Returned to Production
H2S Reduced at Gas Plant with MC B-8650 & MC B-8900
Filter Changes Reduced from Every 4 Hours to Every 4 Days
Multi-Chem Treatment Program Outshines Competition
Iron Sulfide Issues Resolved
MC B-8900 Eliminates Source of H2S in Gas Well
One Time Treatment Proves to Be Cost Effective
Microbial Activity Halted with MC B-8650 & MECT1 Treatment
H2S Levels Reduced Below 4 ppm to Meet Sales Specs
Flowback Water Treated Using Environmentally Conscious Chemical Options
Bacteria and Scale Eliminated with use of NaturaLine™ Program
Corrosion Inhibitor Affects Production Rates for Gas Producing Wells
Change to Oil Soluble Corrosion Inhibitor Proves Successful
MC C-6791 Controls Corrosion and Scale
Economic Treatment Program Also Reduces Failures
MC 748-6 Successfully Used to Treat "Untreatable" Corrosion
Emulsion Problems Resolved by Removing an Ineffective Corrosion Inhibitor
Enhanced Pipeline Pigging
Using MX 6-1033 as a pigging tool
MX 626-6 Protects Entire Gas Lift System
Used to Replace Several Products
Multi-Chem Treating Program Cuts Failures
Iron Levels Reduced and FeS Solids Eliminated
MC C-6955 Controls Oxygen Corrosion in Water Disposal System
Repairs and System Down Time Eliminated
MC MX 363-7 Defoamer Reduces Line Pressure 120 PSI
Oil Production Increases 7 Barrels per Day
MC DF-7120 & MC EB-1590 used to successfully treat an emulsified tank
Producer nets 150 Barrels of clean oil and a clean system
MX 363-7 and MX 426-7 Used to Defoam Heavy Crude
Treating Costs reduced 40% and Regulatory Fines Reduced
Frequent Filter Changes Eliminated with MC M-8120
Elimination of emulsion and solids deposition
Multi-Chem Provides Fast Emulsion Resolution
Treating Frac Flow Back Emulsions
MC EB-1655 Treats Waste Oil
Achieves $22,500 in Savings
MC MX 568-1 Emulsion Breaker Treats Oil to Pipeline Specifications
Sales Tank Treating Eliminated
MC MX 326-1 Treats Oil and Cleans Up Water
Injectivity Issues Reduced and Oil Production Increased
Multi-Chem's Batch Treatment Resolves Emulsion and Paraffin Problem
Shut-In Well Returned to Production Preventing $10,000/Day Revenue Loss
MC EB-1580 Treats Crude Oil to Pipeline Quality
Costly Remediation Steam Treatments Eliminated
MX 996-1 Emulsion Breaker Improves Water Quality
Reduces amount of chemical required for water clarification
Collaboration Leads to Long Term Solution for Operator
Congealed Oil and Emulsion Issues Resolved
MC EB-1590 Reduces Filter Changes
Operation Downtime and Filter Cost Reduced
MC EB-1625 Improves Injection System Operations
Water Quality Improves as Direct Savings of $156,000/year Achieved
Development of new EB lowered treating rates
Improved injection water quality
FA-4330 foamer replaces foam sticks
Reduces LOE and increases revenue $7110 / day
Foamer Injected via Capillary String Unloads Gas Well
Production Increases 150 MCF/Day for a 1,029% ROI
MC FA-4500 Foamer Increases Gas Production 525 mcf/day
Costly capital expenses are eliminated!
Injection Pressures Reduced More Than 60%
Producers LOE Lowered with MC FA-4210
MC FA-4013 Unloads Well and Eliminates Scale and Corrosion
Production increases 24.5mcf / day for 1,330% ROI.
Producer allows Multi-Chem to Optimize Foamer Rates
Production increases 900 mcf/d for 7,750% ROI
Application of FA-4280 Increases Gas Well Production
Production Increased from 350 mcfd to 850 mcfd and Stabilized
Piceance Field producer increases production 275 mcf/d
Return on foamer investment: 4,960%
MC FA-4230 Foamer in Slick Water Frac Reduces Pressures
Frac Rate Increased and Load Return Accelerated
Multi-Chem foamer replaces foam sticks
LOE decreases and production revenue increased $770 / day
Dead Well Revitalized with MC FA-4280 F.A.L. Foamer
Gas Production Increases 300 MCF/day on Shut-In Well
FA-4249 Foamer increases production 60 MCF/Day
Lease Operating Expenses and Operator Intervention Reduced
Problematic Gas Well Unloaded with MC FA-4500 F.A.L. Foamer
Gas Production Stabilizes at 1 MMCF/day
Gas Production Increases 55 MCF/Day
Water and Condensate production triples!
MC MX 521-7 Combination Product Reduces Chemical Costs
MC MX 23-8 Scavenger Eliminates H2S
Shut-in Gas Well treated with MC FA-4007 Foamer
Production increases 325 MCF/d - 5,300% ROI!!
Nearby Frac job causes liquid loading on Gas Well
Production restored with MC FA-4249
Gas Well Production Increases 400 mcf /day
Capital Costs and Shut-in time Eliminated
Application of MC MX 709-4 Increases Gas Well Production
Incremental Increase of Surface Gas Production
Application of MC FA-4009 Increases Gas Well Production
Production Increased 400 mcf per Day!
Application of Combination Foaming Agent MC FA-4009
Production Increases 450 mcfd and Scaling Tendencies Mitigated
Elimination of Gas Lift Compressor by Utilizing MC FA-4211
$96,000/yr in Rental Expenses Eliminated; Gas Production Increased 80 mcfd
FAL and Capillary Installation Revives South Texas Well
Gas Production Increases 350 MCFD on Shut In Well
Batch Application of MC FA-4211 Increases Gas Well Production
Re-Entry Well Kickoff / Production Increased from 42 mcfd to 1,500 mcfd
MC FA-4990 Unloads Well and Eliminates Wellhead Compression
Production Increased 200 mcfd or $275,000/yr!
MC FA-4013 Used to Unload New Gas Well
Gas Production Increases 96 MCFD on Logged Off Well
Utilizing MC FA-4280 Eliminated Gas Lift Compressor
Operator Saves $60,000/yr and Increases Production 400 mcf/day
Application of MC FA-4612 Increases Gas Well Production
Production Increased 400%, from 300 mcfd to 1,200 mcfd
MC FA-4131 with Plunger Lift Increases Production
Stabilized Well at Desired Flow Rate
MC FA-4275 Unloads Mature Shut In Gas Well
Production of 200 mcfd Attained from Dead Well!
Production Separator Foam Carryover
Downhole corrosion
MC FA-4844 Pre-Swab Foaming Agent Treatment
Foamer Additive Pays Big Dividends for Operator
MC FA-4007 Unloads Gas Well Utilizing Velocity String
Production Increases 100 mcfd!
MC FA-4007 Unloads Gas Well and Eliminates Need for Swabbing
Production Increases 820 mcfd and 10 BOPD
MC FA-4002 Steadies Flow on Liquid Slugging Gas Well
Foaming Application Eliminates Operator Intervention and Increase Production 37%
MC FA-4230 Foamer Unloads High MCF Well
Operator No Longer Purchases Gas for Gas Lift Well
MC MX 4-1998 Hydrocarbon Foamer Increases Production
80/20 Condensate/Water Well Unloads Beyond Expectations
MX 4-2008 Hydrocarbon Foamer Unloads Well
Production Increases Significantly During Trial
MC FA-4500 Used to Unload Sour 10,000 ft. Well
Production Increases 265% Along with New Oil Production
MC FA-4500 Used to Unload Sour 10,000 ft. Well
Production Increases 265% Along with New Oil Production
Wells unloaded with MC MX 4-1540
Production Increases 2733% and Pumping Units Eliminated
MC SS-5053 Surfactant Reduces Pressure in Frac Jobs
Operator Saves Money Over and Above Pump Company Product
Friction Reducer for Coiled Tubing Milling Operations
MC MX 927-5 lowers pressure needed to drive hydraulic motor
RockOn MX 664-5 Increases Revenue by $495,160
Oil and Gas production more than Doubles in First 45 days
MX 91-8 for Hydrogen Sulfide Reduction at the Wellhead
Reduce Shut In Time from Elevated Hydrogen Sulfide Levels
M-8051 Treatment Reduces H2S levels from 11-15 ppm to <3 ppm
Eliminates Shut In of 45 mmcf/day Gas Production
MC 92-8 Reduces H2S Content in Gas Pipeline
Produced Gas Now Within Pipeline Spec
Multi-Chem H2S Scavenger Effectiveness Increased with Tower
Multi-Chem Manager Designs Tower to Help Operator Cut Costs $240/day
H2S Controlled with M-8120 and B-8900
Iron Sulfide Levels and Odor Eliminated
Multi-Chem MX 91-8 H2S Scavenger
Effectively Reduces H2S and Provides $40,000 / Year Chemical Savings
MC M-8041 Improves H2S Scavenging
System Efficiency Increases; 34% Increase in Sulfur Removal
MC M-8009 CO2 Scavenger Reduces CO2 Content of Gas to <2.0%
Operator Able to Produce Gas Wells
MC M-8021 H2S Scavenger Eliminates Safety Hazards of H2S
Well Produces 480 MCF/day H2S-Free Gas
MC MX 888-8 Reduces Chemical Usage
Chemical Plugging Issues Resolved
MC 593-8 Resolves H2S Off-Spec Gas Issues
Continuous Treatment Provides Economic Solution
Use of Partially Spent MC MX 677-8 Reduces Tower Changes 30%
Scavenger Chemistry Utilized to Create Maximum Value
MC MX 668-8 Reduces Cost to Scavenge H2S
Operator Saves $120,000 / Year
MC MX 91-8 Provides Consistent H2S Treatment
Pipeline Specs Met As Operator Saves $36,000/Year
MC M-8041 and Process Improvement Reduce Costs
$115,000 Annual Savings Achieved
MC SS-5005 Eliminates FeS Solids
Treatment Program Reduces TCO by 50%
MC MX 593-8 Reduces H2S in Sales Gas Line
GOM Producer Able to Keep Well Running Continuously.
MC MX 668-8 Reduces Operating Expenses
Superior Service Provided by Multi-Chem Outshines Competition
MX 668-8 reduces H2S Treatment Costs $10,000/month
Dosage Rates Cut 73% with Superior Performing Product
MC MX 668-8 Provides Superior Sweetening of Brackish Sour Water
Chemical Efficiency Improved Over Incumbent Supplier's Program
MC MX 668-8 Provides Superior Sweetening of Brackish Sour Water
Chemical Efficiency Improved Over Incumbent Supplier's Program
Superior Gas Sweetening Performance Provided by MC MX 8-1183
Batch Tower Run Time Extended 28% and Flooded Tower Rates Cut 40%
Iron Sulfide Problems Solved with MC M-8300 and LOE Decreases
MC HI-1000 Eliminates Hydrate Problems
Iron Sulfide is Removed with M-8280
Solids Removal and Prevention Increases Oil Production
MC M-8120 Eliminates Costly Compressor Downtime
Filter Changes Reduced from Unscheduled Weekly to Scheduled Monthly
MC M-8120 Cleans Up Iron Sulfide Deposition
Gas Production Increases 50 MCF/day and LOE Reduced
Mixture of M-8280, M-2101, SS-5651 Eliminates Gunk
Operator Saves $390,000/Yr and Operation Efficiency Improves
MC M-8280 Eliminates Downhole Iron Sulfide Deposits
Lease Operating Expenses Reduced as Production Increases
MC M-8280 Cleans Iron Sulfide in System
H2S Reduced and Production Increased
AcroClear™ Acrolein Cleans up Black water
Oil Production Increases 3 Barrels / Day with Clean Water
AcroClear™ Acrolein Revives Dead SWD Well to Take Water
Injection Well Problems Eliminated - Pressure and Flow Improved
Multi-Chem AcroClear® Improves Well Injectivity
Long Term Benefits from a Single Treatment
AcroClear™ Mitigates SWD Filter Issues
Black FeS Dissolved and Savings of $58,100 / year Projected
AcroClear™ Acrolein Eliminates Well Failures
Squeeze Treatment Proves to be Effective for Over 6 Months
Freezing Gas Well Line Problem Assessed
LDHI evaluated but Methanol still best option
MC HI-1000 Applied in Methanol Prevents Surface Line Plugging
"Super Methanol" Provides Savings of $2600 / Month
MC MX 377-5 LDHI Eliminates Hydrate Problems in Pipeline
Savings Over Methanol and LOE slashed!
MC HI-1000 Applied with Methanol to Prevent Surface Lines from Plugging
Pigging Time Cut Significantly Reducing LOE
MC MX 773-5 LDHI Controls Hydrates in Pipeline
Control Costs Reduced $7,440 / month (57.1% Reduction)
Deepwater Anti-Agglomerate Hydrate Inhibitor MC MXU 5-1126
Controlling hydrate formation in a 9-mile subsea tieback
MXU 5-1126 LDHI-AA Test @Deepwater Gas Condensate Well
Methanol Issues Eliminated and Injection Rates Cut by 98%
MC MX 773-5 LDHI Controls Hydrates in Pipeline
Methanol Usage Eliiminated
DJ Basin Hydrate Issue Resolved with MC HI-9550
Methanol Eliminated and Costs Slashed
Optimization of MC MX 892-5 LDHI Reduces LOE 25%
MC MX 892-5 Outperforms Competitive LDHI
MC MX 892-5 Controls Hydrate Deposition
Cost-Effective solution provides $1572/month in savings over Methanol!
MX 892-5 Controls Hydrate Deposition in Pipeline
Cost Effective Hydrate Control & Savings in Trucking Costs Realized
Paraffin Problems Resolved
MC P-3139 Triples Gas Production
Paraffin Deposits Eliminated while Unloading Gas Lift Wells.
Multi-Chem products paraffin control P-3901 and foamer FA-4001 successful
Multi-Chem Ensures Oil Meets Pipeline Transport Requirements
Pipeline Required Stringent Oil Quality from the Producer
MC P-3139 Controls Paraffin Deposition
Wire-Line Cutting Eliminated Saving Operator $10,000/month
MC P-3049 Controls Paraffin in High Producing Oil Well
Paraffinic Emulsion Block Eliminated - Saves Producer $600,000 / Incident
MC P-3139 Keeps Texas Panhandle Flowline Paraffin Free
Producer Realizes Large $ Savings
MC P-3319 Controls Paraffin Deposition
Problems with Wax in Pipeline Eliminated
MC P-3650 Batch Treatments Solubilize Paraffin Deposits
$150,000 in Revenue Added and LOE Slashed!
P-3099 Prevents Injection Well Plugging
Provides a Quick Solution for Troublesome Issue
MC P-3920 Eliminates Paraffin Plugging
Power Oil System Functions More Efficiently
MC P-3480 Eliminates Paraffin Plugging
Also Removes Emulsion Problems tied to Paraffin
MC P-3480 Eliminates Paraffin Buildup
Hot Oiling Jobs No Longer Required
MC P-3920 Eliminates Severe Wax Deposition
Effective reduction in wax treating costs
MC P-3650 Removes Wax in Subsea Pipelines
30% Pipeline Volume Removed Economically
Hydrocarbon Production Doubles with MX 5-1839 Downhole Flush
Five Wells Successully Batched to Remove Paraffin Deposition
MC MX 519-3 Reduces Paraffin Deposition in Gas Lift System
Wire-line Costs Reduced and Production Improved
MC Foamer and Fresh Water Control Salt Problems
Swab Truck and Workover Rig Costs Significantly Reduced
Salt Deposition Eliminated and Compressor Run Time Increased
Liquid Levels Controlled and Profit Increased $19,000 per week!
Scale Control in Discharge Water Valve
S-2355 Reduces Downtime and Greater Water Disposal Costs
Pump Run Life Extended from 3 Days to Over 2 Years
Multi-Chem Scale Inhibitor Inhibits BaSO4 Scale
MC SS-5651 Controls Salt Deposition In Compressor
System Downtime and Reparation Costs Eliminated
Scale Deposits Removed with MC S-2099
MC S-2041 Inhibits Scale and Nets Producer $2,400 in Increased Production
Multi-Chem Reduces workover costs $180,000/yr
Injection Volumes Maintained with Cost-Effective Solution
MC SS-5651 Salt Dispersant Eliminates Downtime
Salt Controlled and Workovers No Longer Required
MC S-2101 Inhibits CaCO3 Deposition
Single Treatment Lasts over 5 Months
MC SS-5844 Increases Production 1200%
LOE Reduced $240,000/year
MC S-2041 Inhibits CaCO3 Scale
Producer Saves $125,000 in Cleanup Costs and Lost Revenue
Multi-Chem Program Eliminates Costly Failures
Operator's Net Revenue Increased $16,000/month
MC S-2340 Scale Pellets Control BaSO4 and CaCO3
Failures Eliminated on Rod Pump Well
MC S-2099 Scale Remover Increases Oil Production
Failures Eliminated as Production Increased 300%
Multi-Chem Increases Gas Production with Improved Effluent Water Quality
Increased Revenue for Gas Producer
AcroClear™ Reduces Chemical and Tank Cleaning Expenses
TCO Reduced $38.7K / yr for a 27% ROI
Multi-Chem M-8172 Cleans Tubing
Costs and Messy Cleanups are Eliminated
Wetting Agent Contributes to Efficacy of Acid Treatment
Well Returned to Profitable Production
MC SS-5053 Applied to Cleanup SWD Wells
Cost Savings of $32,880/Year/Well Achieved
Joint Development Program Yields Superior Friction Reducer
NaturaLine™ MX 14-5 Saves Operator $118,000
MC M-8120 Antifoulant Controls Fouling in Compressors
Treatment Program a Fraction of Previous Program
MC S-2033 Maintains Low PSI and Reduces Oil Carrier Solvent
$1.46 Million in Annual Savings Achieved
MC M-8120 Eliminates Salt Deposition in Compressor Valves
Downtime Reduced as Operating Costs Are Slashed
Multi-Chem Designs an Austin Chalk stimulation treatment
Production Increased 1400% (350 MCF/D and 11 BOPD)!
MC M-8172 Removes Coal Fines
Hydraulic Pump Run Time increases along with Gas Production
RockOn MX 833-5 Reduces Injection Pressure in SWD Well
Pressure Dropped 1000 PSI and Water Injection Increased 500 BWPD
RockOn™ MX 833-5 Increases Revenue $99,932 in 15 days
Gas Production Up 456%. Oil Production Up 107%.
RockOn™ MX 833-5 Increases Oil and Gas Recovery
Typical Frac Job Time and Expenses Slashed
MC MX 833-5 Prevents Pressure Increases in SWD Well
Deposition and Acid Jobs Eliminated with Continuous Injection Program
Industry Event Calendar
Learn more on our SlideShare page
  • Site Map
  • Privacy Policy
  • Terms & Use
  • Contact Us
  Copyright ©2011 Multi-Chem Group LLC. All rights reserved.