- Company
- Production Challenges
- Products
- Safety & Environment
- Services
MULTI-CHEM CELEBRATES GRAND OPENING
OF SHAFTER LOCATION
SHAFTER, Calif. (April 1, 2010) - Multi-Chem®, a global provider of oilfield production chemicals, celebrated the grand opening of its new West Coast location in Shafter, Ca. on Wednesday, announced Harold Johnson, Vice President of Global Business Development.
Multi-Chem hosted over 100 people at the grand opening event held at the new facility on Wednesday, which included lunch, tours of the laboratory and an address from Multi-Chem President and Chief Executive Officer, James Archer.
The facility consists of 3,000 sq ft of office space, a 1,600-sq-ft laboratory and a 4-acre storage yard. It will provide service, sales support, technical analysis and delivery of specialty production chemicals for the oil and gas industry throughout Kern, San Luis Obispo, Tulare, Kings, Ventura, Los Angeles, Fresno, Merced and Madera counties, the largest producing area in California. The Shafter office is the third Multi-Chem location on the West Coast. Other offices, laboratories, blend plants and warehouses are located in Ventura and Meridian.
The facility’s operations will be managed by Regional Operations Manager, Mark Wade, who has over 25 years of industry experience in production chemicals within California.
According to Wade, Multi-Chem strategically places offices within a 100-mile radius of its customers’ fields to provide focused local service.
“Superior local service is one of Multi-Chem’s fundamental objectives so that we can provide technical analysis and product support that is specific to the area and the technical challenges our customers are facing,” Wade said.
Benefits
- Cost effective alternative to mechanical equipment
- Minimal capital investment required to get program in place
- Extend the useful life of current well equipment
- Maximize production capabilities and reduced downtime
- Reduce corrosion in the well by removing water
-
Corrosion Inhibitor Affects Production Rates for Gas Producing Wells
-
Application of FA-4280 Increases Gas Well Production
Production Increased from 350 mcfd to 850 mcfd and Stabilized
-
Paraffin Deposits Eliminated while Unloading Gas Lift Wells.
Multi-Chem products paraffin control P-3901 and foamer FA-4001 successful
-
FA-4013 controls corrosion and unloads well
-
MC Foamer and Fresh Water Control Salt Problems
Due to the high brine of the well, salt was depositing downhole, reducing the well's production.
-
MC FA-4230 Foamer Unloads High MCF Well
-
MC FA-4002 Steadies Flow on Liquid Slugging Gas Well
-
MC FA-4007 Unloads Gas Well and Eliminates Need for Swabbing
-
MC FA-4007 Unloads Gas Well Utilizing Velocity String
-
MC FA-4844 Pre-Swab Foaming Agent Treatment
-
MC FA-4990 Eliminates Separator Foam Carryover
-
MC FA-4131 with Plunger Lift Increases Production
A plunger lift well in Western Oklahoma was experiencing liquid loading issues.
-
MC FA-4275 Unloads Mature Shut In Gas Well
-
Application of MC FA-4612 Increases Gas Well Production
-
Utilizing MC FA-4280 Eliminated Gas Lift Compressor
-
Gas Production Increases 96 MCFD on Logged Off Well
-
MC FA-4990 Unloads Well and Eliminates Wellhead Compression
-
Batch Application of MC FA-4211 Increases Gas Well Production
Re-Entry Well Kickoff / Production Increased from 42 mcfd to 1,500 mcfd
-
Elimination of Gas Lift Compressor by Utilizing MC FA-4211
$96,000/yr in Rental Expenses Eliminated; Gas Production Increased 80 mcfd
-
Application of Combination Foaming Agent MC FA-4009
Production Increases 450 mcfd and Scaling Tendencies Mitigated
-
Application of MC FA-4009 Increases Gas Well Production
-
Application of MC MX 709-4 Increases Gas Well Production
-
Gas Well Production Increases 400 mcf /day
-
Nearby Frac job causes liquid loading on Gas Well
-
Shut-in Gas Well treated with MC FA-4007 Foamer
-
MC MX 521-7 Combination Product Reduces Chemical Costs
-
Gas Production Increases 55 MCF/Day
-
Problematic Gas Well Unloaded with MC FA-4500 F.A.L. Foamer
-
FA-4249 Foamer increases production 60 MCF/Day
-
Dead Well Revitalized with MC FA-4280 F.A.L. Foamer
-
Multi-Chem foamer replaces foam sticks
-
MC FA-4230 Foamer in Slick Water Frac Reduces Pressures
-
Piceance Field producer increases production 275 mcf/d
-
MC FA-4013 Unloads Well and Eliminates Scale and Corrosion
-
Injection Pressures Reduced More Than 60%
-
MC FA-4500 Foamer Increases Gas Production 525 mcf/day
-
Foamer Injected via Capillary String Unloads Gas Well
-
FA-4330 foamer replaces foam sticks
Symptoms
- Sudden increase in production decline curve
- Gas well is no longer flowing
- Irregular production as well builds and releases pressure
- Well requires frequent intervention to keep it producing
- Decline in liquids production (condensate and water) indicating that the well is retaining fluids
- Increasing casing pressure, reduced tubing pressure; large pressure differential
- Fluctuating line pressures causing production problems
Corrosion Inhibitor Affects Production Rates for Gas Producing Wells
Application of FA-4280 Increases Gas Well Production
Production Increased from 350 mcfd to 850 mcfd and Stabilized
Paraffin Deposits Eliminated while Unloading Gas Lift Wells.
Multi-Chem products paraffin control P-3901 and foamer FA-4001 successful
FA-4013 controls corrosion and unloads well
MC Foamer and Fresh Water Control Salt Problems
Due to the high brine of the well, salt was depositing downhole, reducing the well's production.
MC FA-4230 Foamer Unloads High MCF Well
MC FA-4002 Steadies Flow on Liquid Slugging Gas Well
MC FA-4007 Unloads Gas Well and Eliminates Need for Swabbing
MC FA-4007 Unloads Gas Well Utilizing Velocity String
MC FA-4844 Pre-Swab Foaming Agent Treatment
MC FA-4990 Eliminates Separator Foam Carryover
MC FA-4131 with Plunger Lift Increases Production
A plunger lift well in Western Oklahoma was experiencing liquid loading issues.
MC FA-4275 Unloads Mature Shut In Gas Well
Application of MC FA-4612 Increases Gas Well Production
Utilizing MC FA-4280 Eliminated Gas Lift Compressor
Gas Production Increases 96 MCFD on Logged Off Well
MC FA-4990 Unloads Well and Eliminates Wellhead Compression
Batch Application of MC FA-4211 Increases Gas Well Production
Re-Entry Well Kickoff / Production Increased from 42 mcfd to 1,500 mcfd
Elimination of Gas Lift Compressor by Utilizing MC FA-4211
$96,000/yr in Rental Expenses Eliminated; Gas Production Increased 80 mcfd
Application of Combination Foaming Agent MC FA-4009
Production Increases 450 mcfd and Scaling Tendencies Mitigated
Application of MC FA-4009 Increases Gas Well Production
Application of MC MX 709-4 Increases Gas Well Production
Gas Well Production Increases 400 mcf /day
Nearby Frac job causes liquid loading on Gas Well
Shut-in Gas Well treated with MC FA-4007 Foamer
MC MX 521-7 Combination Product Reduces Chemical Costs
Gas Production Increases 55 MCF/Day
Problematic Gas Well Unloaded with MC FA-4500 F.A.L. Foamer
FA-4249 Foamer increases production 60 MCF/Day
Dead Well Revitalized with MC FA-4280 F.A.L. Foamer
Multi-Chem foamer replaces foam sticks
MC FA-4230 Foamer in Slick Water Frac Reduces Pressures
Piceance Field producer increases production 275 mcf/d
MC FA-4013 Unloads Well and Eliminates Scale and Corrosion
Injection Pressures Reduced More Than 60%
MC FA-4500 Foamer Increases Gas Production 525 mcf/day
Foamer Injected via Capillary String Unloads Gas Well
FA-4330 foamer replaces foam sticks
Root Cause
As wells mature, production volumes and bottom-hole pressures decrease. The resulting production velocity is insufficient to carry the produced liquids to the surface. These liquids accumulate in the well, reducing or preventing production. This scenario is referred to as liquid loading.
Corrosion Inhibitor Affects Production Rates for Gas Producing Wells
Application of FA-4280 Increases Gas Well Production
Production Increased from 350 mcfd to 850 mcfd and Stabilized
Paraffin Deposits Eliminated while Unloading Gas Lift Wells.
Multi-Chem products paraffin control P-3901 and foamer FA-4001 successful
FA-4013 controls corrosion and unloads well
MC Foamer and Fresh Water Control Salt Problems
Due to the high brine of the well, salt was depositing downhole, reducing the well's production.
MC FA-4230 Foamer Unloads High MCF Well
MC FA-4002 Steadies Flow on Liquid Slugging Gas Well
MC FA-4007 Unloads Gas Well and Eliminates Need for Swabbing
MC FA-4007 Unloads Gas Well Utilizing Velocity String
MC FA-4844 Pre-Swab Foaming Agent Treatment
MC FA-4990 Eliminates Separator Foam Carryover
MC FA-4131 with Plunger Lift Increases Production
A plunger lift well in Western Oklahoma was experiencing liquid loading issues.
MC FA-4275 Unloads Mature Shut In Gas Well
Application of MC FA-4612 Increases Gas Well Production
Utilizing MC FA-4280 Eliminated Gas Lift Compressor
Gas Production Increases 96 MCFD on Logged Off Well
MC FA-4990 Unloads Well and Eliminates Wellhead Compression
Batch Application of MC FA-4211 Increases Gas Well Production
Re-Entry Well Kickoff / Production Increased from 42 mcfd to 1,500 mcfd
Elimination of Gas Lift Compressor by Utilizing MC FA-4211
$96,000/yr in Rental Expenses Eliminated; Gas Production Increased 80 mcfd
Application of Combination Foaming Agent MC FA-4009
Production Increases 450 mcfd and Scaling Tendencies Mitigated
Application of MC FA-4009 Increases Gas Well Production
Application of MC MX 709-4 Increases Gas Well Production
Gas Well Production Increases 400 mcf /day
Nearby Frac job causes liquid loading on Gas Well
Shut-in Gas Well treated with MC FA-4007 Foamer
MC MX 521-7 Combination Product Reduces Chemical Costs
Gas Production Increases 55 MCF/Day
Problematic Gas Well Unloaded with MC FA-4500 F.A.L. Foamer
FA-4249 Foamer increases production 60 MCF/Day
Dead Well Revitalized with MC FA-4280 F.A.L. Foamer
Multi-Chem foamer replaces foam sticks
MC FA-4230 Foamer in Slick Water Frac Reduces Pressures
Piceance Field producer increases production 275 mcf/d
MC FA-4013 Unloads Well and Eliminates Scale and Corrosion
Injection Pressures Reduced More Than 60%
MC FA-4500 Foamer Increases Gas Production 525 mcf/day
Foamer Injected via Capillary String Unloads Gas Well
FA-4330 foamer replaces foam sticks
Solutions
Multi-Chem foamers reduce liquid density which causes a reduction in the critical velocity of the well. This is the velocity required to lift produced fluids to the surface. Foamers can be applied on a continuous basis down the backside of wells or via capillary string. They can also be applied in batch treatments. Multi-Chem offers a wide variety of foamers that are “fit for use” for a wide variety of operational conditions including:
- Capillary approved products
- Deepwater production
- High temperature stable for deep, hot gas wells
- Winterized for colder climates
- Multi-functional formulations – which include additives for mineral scale control and corrosion inhibition
Corrosion Inhibitor Affects Production Rates for Gas Producing Wells
Application of FA-4280 Increases Gas Well Production
Production Increased from 350 mcfd to 850 mcfd and Stabilized
Paraffin Deposits Eliminated while Unloading Gas Lift Wells.
Multi-Chem products paraffin control P-3901 and foamer FA-4001 successful
FA-4013 controls corrosion and unloads well
MC Foamer and Fresh Water Control Salt Problems
Due to the high brine of the well, salt was depositing downhole, reducing the well's production.
MC FA-4230 Foamer Unloads High MCF Well
MC FA-4002 Steadies Flow on Liquid Slugging Gas Well
MC FA-4007 Unloads Gas Well and Eliminates Need for Swabbing
MC FA-4007 Unloads Gas Well Utilizing Velocity String
MC FA-4844 Pre-Swab Foaming Agent Treatment
MC FA-4990 Eliminates Separator Foam Carryover
MC FA-4131 with Plunger Lift Increases Production
A plunger lift well in Western Oklahoma was experiencing liquid loading issues.
MC FA-4275 Unloads Mature Shut In Gas Well
Application of MC FA-4612 Increases Gas Well Production
Utilizing MC FA-4280 Eliminated Gas Lift Compressor
Gas Production Increases 96 MCFD on Logged Off Well
MC FA-4990 Unloads Well and Eliminates Wellhead Compression
Batch Application of MC FA-4211 Increases Gas Well Production
Re-Entry Well Kickoff / Production Increased from 42 mcfd to 1,500 mcfd
Elimination of Gas Lift Compressor by Utilizing MC FA-4211
$96,000/yr in Rental Expenses Eliminated; Gas Production Increased 80 mcfd
Application of Combination Foaming Agent MC FA-4009
Production Increases 450 mcfd and Scaling Tendencies Mitigated
Application of MC FA-4009 Increases Gas Well Production
Application of MC MX 709-4 Increases Gas Well Production
Gas Well Production Increases 400 mcf /day
Nearby Frac job causes liquid loading on Gas Well
Shut-in Gas Well treated with MC FA-4007 Foamer
MC MX 521-7 Combination Product Reduces Chemical Costs
Gas Production Increases 55 MCF/Day
Problematic Gas Well Unloaded with MC FA-4500 F.A.L. Foamer
FA-4249 Foamer increases production 60 MCF/Day
Dead Well Revitalized with MC FA-4280 F.A.L. Foamer
Multi-Chem foamer replaces foam sticks
MC FA-4230 Foamer in Slick Water Frac Reduces Pressures
Piceance Field producer increases production 275 mcf/d
MC FA-4013 Unloads Well and Eliminates Scale and Corrosion
Injection Pressures Reduced More Than 60%
MC FA-4500 Foamer Increases Gas Production 525 mcf/day
Foamer Injected via Capillary String Unloads Gas Well
FA-4330 foamer replaces foam sticks
Next Steps
How can you determine if Multi-Chem foamers can help you?
The following information will help Multi-Chem to determine the proper treatment method for your production challenge:
- Production data
- Existence of packers
- Pressure profiles
- System specifications
- Brine density
- Fluid level
- Foam density
- Current treatment regime